Through it all, we are still improving lives and communities. Our response to COVID-19.

Case Study: Legacy Transmission Pipeline Replacement Accomplished Despite Multiple Environmental and Logistical Hurdles

Case Studies 08-20-2020

Replacing a legacy natural gas pipeline for integrity purposes can be routine—until it isn’t. That was the case for a 24-inch pipeline ...

Case Study: How Integrated Design Enabled an Aggressive Fulfillment Center Redesign and Construction Schedule to Be Met

Case Studies 12-04-2019

Logistics Center II is a 1 million sf global e-commerce fulfillment center on Dallas/Fort Worth International Airport land. Unlike a typical speculative warehouse design ...

Case Study: Small Class A Office Footprint Challenges Overcome Using LID, Other Stormwater Management Strategies

Case Studies 08-21-2019

Halff Associates played an integral role in the development of this modern, sustainable site development south of downtown Austin. The 801 Barton Springs ...

Case Study: Unique Bypass Channel Design Removed Roadway from the 100-Year Floodplain, Provided Cost Savings

Case Studies 04-03-2019

Bulverde Road in Bexar County, Texas, has become a major travel route for commuters and residents attempting to avoid the increasing congestion ...

Case Study: How a Custom Software Flood Assessment Tool Helps Prioritize Future Analysis

Case Studies 03-06-2019

Floods can’t be prevented entirely. That being said, flood risk can be identified, and mitigation measures can be established to reduce flood risk and consequences ...

MEDIA CONTACT

Jodi Hausenfluke
(214) 346-6257
jHausenfluke@halff.com

UPCOMING EVENTS

Texas Floodplain Management Association (TFMA) Technical Summit
Virtual: Register now!
Sept. 29 – 30, 2020

Texas Municipal League Annual Conference
Virtual: Register now! 
Oct. 14 – 16, 2020

Design Build Institute of America (DBIA) for Transportation/Aviation Conference
National Harbor, Maryland
Oct. 28 – 30, 2020